DHA Phase 8, Karachi · Display centre in DHA Phase 6

Home Lifts & Elevators in DHA Phase 8, Karachi

Hub Elevator installs home lifts and glass lifts for DHA Phase 8 bungalows, passenger and service lifts for commercial buildings in Al-Murtaza Commercial, and cargo lifts and dumbwaiters for shops and restaurants. Our display centre in DHA Phase 6 is a short drive away, and every project starts with a free site survey.

  • ✓ Display centre in DHA Phase 6
  • ✓ Authorised Fuji distributor
  • ✓ 24/7 breakdown line
  • ✓ Free site survey
Glass home lift next to a wooden staircase in a villa, installed by Hub Elevator

Glass home lift installed by Hub Elevator

Hub Elevator for DHA Phase 8 at a glance

Nearest Hub officeDisplay centre: Office 401, 4th Floor, Plot 40-C, Lane 3, Bukhari Commercial, DHA Phase 6, Karachi
Head officeOffice 407, Yousuf Chamber, Main Shahrah-e-Faisal, Karachi
Phone & WhatsApp0333 202 4498
For homesHome lifts, glass and panoramic lifts, compact lifts, stairlifts
For commercial buildingsPassenger lifts, service and goods lifts, dumbwaiters
After installationAnnual maintenance (AMC) and 24/7 breakdown repair
Before you buyFree site survey, then a written quotation in PKR

Home lifts for DHA Phase 8 bungalows

Many DHA Phase 8 homes are large bungalows on 500 to 2,000 sq yd plots, often with a basement, two upper floors and a usable roof. A home lift makes every level easy to reach for elderly parents, children and guests, and adds value to the property.

Glass home lift with steel frame installed in a private residenceHome lift landing door installed in a bungalowHome lift landing door next to the lounge in a house

Glass lift beside the staircase

A glass or panoramic lift fitted in the stairwell keeps the home open and bright, and suits the modern interiors common in Phase 8.

Glass and panoramic lifts →

Compact lift for an existing house

Compact home lifts fit small shafts and can be added to a built house with limited civil work. We check pit depth, headroom and power at the survey.

Home lift price and space guide for Karachi →

Backup for load shedding

An automatic rescue device (ARD) brings the cabin to the nearest floor during a power cut, so no one is stuck between floors.

Lift backup options →
WhatsApp about a home lift

Lifts for commercial buildings in Al-Murtaza Commercial

Commercial buildings in Phase 8, such as those in Al-Murtaza Commercial and along Zulfiqar Street, are often basement plus ground plus four or five floors, with shops below and offices or apartments above. Tenants expect a reliable lift from day one.

Passenger lifts for offices and apartments

8 to 13-person passenger lifts with machine-room-less (MRL) options that save roof space, plus Fuji models for a premium finish.

Passenger lifts →
Lifts for commercial buildings in Karachi →

Service and goods lifts for shops

A separate goods lift keeps deliveries and stock away from the passenger lift and protects its cabin.

Cargo and goods lifts →

Dumbwaiters for restaurants and cafés

A dumbwaiter moves food and dishes between the kitchen and upper floors, saving staff time on every shift.

Dumbwaiter lifts →
WhatsApp about a commercial lift

Near the sea

Built for sea-facing homes in Phase 8

Salt air near the coast speeds up corrosion on steel, door tracks and electrical contacts. For Phase 8 homes we recommend:

  • Stainless steel or coated finishes for doors and frames
  • Protected door operators and sealed electrical parts
  • Regular cleaning and lubrication under an annual maintenance contract

Lift prices for DHA Phase 8 (estimates)

Every building is different, so these are rough guide ranges for supply and installation, not quotes. Your exact price comes in a written quotation after a free site survey.

Lift typeApproximate range (PKR)
Home / residential liftapprox. 10 lakh – 35 lakh+
Passenger liftapprox. 25 lakh – 80 lakh
Cargo / freight liftapprox. 20 lakh – 1.2 crore
Panoramic / glass / capsule liftapprox. 35 lakh – 1 crore
Hospital bed liftapprox. 40 lakh – 1 crore
Annual maintenance contract (AMC)roughly 1.5 lakh – 5 lakh a year

Estimates only. Prices vary with brand, number of floors, capacity, speed, cabin finish and the exchange rate, and exclude civil and electrical work. See our elevator price guide for Pakistan for details.

How it works

From first message to a running lift, with one team responsible throughout.

1
WhatsApp or call
Tell us the building type, floors and what you need. We reply the same day.
2
Free site survey
An engineer visits to check the shaft, pit, headroom and power supply.
3
Written quotation
You get a clear quote with the recommended lift and specification.
4
Installation and testing
We install, test and commission the lift, then hand it over.
5
Maintenance and 24/7 support
Optional AMC keeps the lift safe, with breakdown support day and night.

Nearby areas we also cover

From our DHA Phase 6 display centre we regularly visit sites in:

  • DHA Phase 8
  • Al-Murtaza Commercial
  • Zulfiqar Commercial
  • Khayaban-e-Hilal
  • DHA Phase 7
  • DHA Phase 6
  • DHA Phase 5
  • Clifton
  • Defence View
  • PECHS

See all our lift services in Karachi.

Book a free site survey in DHA Phase 8

Send your details and our Karachi team will call you to arrange a visit. Prefer WhatsApp? Message us here.

DHA Phase 8 lift FAQs

Can a lift be added to an existing house in DHA Phase 8?

Yes, in most cases. A compact or glass home lift can be fitted in the stairwell, a corner of the house or an outside shaft. Our engineer checks the space, pit depth, headroom and power supply during a free site survey.

How much does a home lift cost in DHA Phase 8?

As a 2026 estimate, home lifts cost approx. 10 lakh to 35 lakh PKR or more, supplied and installed, depending on floors, size, glass or steel finish and brand. These are estimates only; the exact price comes in a written quotation.

Do you install lifts for commercial buildings in Al-Murtaza Commercial?

Yes. We install passenger lifts, service and goods lifts and dumbwaiters for shops, offices, restaurants and apartments in Al-Murtaza Commercial and other parts of DHA Phase 8.

Does sea air affect lifts in DHA Phase 8?

Salt air can speed up corrosion on doors, tracks and electrical parts. Stainless steel finishes, protected components and regular maintenance keep the lift reliable near the coast.

Where can I see your lift designs?

Visit our display centre at Bukhari Commercial, DHA Phase 6, a short drive from Phase 8, to see cabin finishes, glass lift options and control panels. Call ahead on 0333 202 4498.

Do you provide maintenance and repair in DHA?

Yes. We offer annual maintenance contracts and a 24/7 breakdown line for homes and buildings across DHA, including lifts installed by other companies.

Planning a lift in DHA Phase 8?

WhatsApp or call for a free site survey and a written quotation, or visit our DHA Phase 6 display centre to see the designs first.