Freestanding Glass Elevator for Aspin Pharma

Project at a glance

ClientAspin Pharma
SectorPharmaceutical manufacturing
BuildingPre-engineered building (PEB)
ScopeDesign, fabrication and installation of a freestanding glass elevator
Key constraintZero attachment or load transfer to the existing building
Delivered in4 months
PressFeatured in Elevator World, September 2026

The Situation: A Lift the Building Could Not Carry

Aspin Pharma needed a passenger lift inside its pharmaceutical facility, which operates in a pre-engineered building (PEB).

That is harder than it sounds. A PEB frame is designed for one specific load envelope. Bolting a lift shaft onto it adds vertical, lateral and dynamic forces the frame was never engineered to carry, which puts the whole building system at risk.

The facility also wanted the lift to match its clean, modern interior, so a conventional concrete or cladded shaft was not an option.

Aspin Pharma
Aspin Pharma 5

The Task: Zero Attachment, Full Glass, Four Months

The brief came down to three non-negotiable requirements:

  • No attachment to the PEB. The lift structure could not transfer any load to the existing columns, beams or wall panels.
  • A fully glazed enclosure. An open, transparent look suited to a pharmaceutical environment.
  • Safe, compliant and on time. Full engineering and safety compliance, delivered within the agreed four-month schedule and inside the existing floor plan.

The Action: How We Engineered It

1. A lift that carries itself

We designed a fully self-supporting steel structure on its own independent foundation. It carries the vertical, lateral, dynamic and wind loads of the cabin, counterweight, machinery and glass enclosure, with no load path into the PEB.

2. Precision inside a working building

  • Positioned the structure with controlled clearances from existing columns and wall panels
  • Designed custom framing to hold large glass panels without distortion
  • Engineered load paths and connections for long-term stability under continuous lift movement

3. A controlled build sequence

  1. Structural design and engineering
  2. Steel fabrication and foundation construction
  3. Erection, levelling and securing of the frame
  4. Lift installation after the structure was complete
  5. Glass panels fitted in a controlled sequence for a true, clean finish
  6. Testing, commissioning and handover

The Result: A Lift That Stands on Its Own

0
Load transferred to the existing building
100%
Freestanding structure on its own foundation
4 months
From design to handover, on schedule
Featured
Reported by Elevator World, Sept 2026

Aspin Pharma now has a fully operational, fully glazed passenger lift that meets every requirement in the brief: complete structural independence from the PEB, a clean transparent finish suited to a pharmaceutical facility, and full engineering and safety compliance.

The project was reported by Elevator World, the international trade publication for the lift industry. Read our news post on the coverage, or see how we upgraded a 32-storey residential tower.

Project Photographs

Questions About This Project

Can an elevator be installed in a pre-engineered building without attaching to it?

Yes. The approach is a self-supporting steel structure on its own foundation, positioned with controlled clearances so that no load transfers into the PEB frame. The structure carries the vertical, lateral, dynamic and wind loads of the lift itself. This is how Hub Elevator delivered the Aspin Pharma glass elevator.

How long did the Aspin Pharma glass elevator take to deliver?

Four months end to end, covering structural design, steel fabrication, foundation work, erection, glazing, lift installation, testing, commissioning and handover.

When is a freestanding lift structure the right choice?

When the host building cannot safely carry shaft loads (pre-engineered and light steel buildings), when walls cannot be cut or loaded, when the premises are leased, or when a glass or panoramic enclosure needs its own framing anyway.

Has this project been covered by the industry press?

Yes. Elevator World, the international vertical transportation trade publication, reported on the project in its Daily News section on 8 September 2026.

Have a building that complicates the lift?

Pre-engineered frames, leased premises, walls that cannot be cut, a glass enclosure the architect will not give up. Tell us the constraint and our engineers will tell you what will work.

Site surveys across Karachi, Lahore, Islamabad and Rawalpindi. Part of Haji Hameed Engineers and Suppliers, in the industry since 1970.

Tell Us About Your Project